TIMETABLE OF THE PRICE RATE

Timetable for The Price Rate of Small Constructions and Repairs

Timetable for The Price Rate of Small Constructions and Repairs 2014 has been updated once in every two years by Department of Acquisition and Cost, Department of Contracts and Quantity Surveying are based on settings by Ministry of Finance. The Timetable of the Price Rate should be used to calculate costs for all works which have been conducted by ballot, and the Timetable of the Price Rate should ever be used for Alteration Works/Variance Occupations (VO) in any contract which has its fundamental based on list of quantity or plan and specifications.

Ballot works means all recondition works for buildings, road, drain, area cleansing, and other fixing works which do not alter the original structure of the building which supposed to be costed below RM 100 000. The Timetable of The Price Rate has been arranged according the list of craftsmanship which has the relation to recondition and modification works.

It is on sale to the public with the cost of RM 20.00 per item at:

Unit Tawaran Pusat,
Cawangan Pengurusan Perolehan dan Harta,
Tingkat Bawah Blok A, Kementerian Kerja Raya,
Jalan Sultan Salahuddin,
50582 Kuala Lumpur

 

Timetable of The Price Rate for The Construction Works Based on Drawing and Specifications

Timetable of The Price Rate for The Construction Works Based on Drawing and Specifications 2015 is part of the documents for contract, based on drawing and specifications which will be used as the foundation in evaluating modification works.

Jadual Kadar Harga (JKH) has been updated at least once in two years by Department of Development and Cost Service, CKUB is based on the current market price of construction items, labor wages, and machinery rental.

It has been arranged according the list of craftsmanship: Piling, Excavation, Concretor, Bricklayer, Drainlayer, Roofer, Carpenter and Joiner, Ironmongery, Steel and Ironworker, Pavior, Plasterer and Tile Fixer, Plumber, Glazier, Painter and Road, Culvert, Fencing and Turfing.

It is on sale to the public with the cost of RM 5.00 per item at:

Unit Tawaran Pusat,
Cawangan Pengurusan Perolehan dan Harta,
Tingkat Bawah Blok A, Kementerian Kerja Raya,
Jalan Sultan Salahuddin,
50582 Kuala Lumpur

 

Book of The Average Cost of Building Construction Meter Square (m2) 2/2014 has been distributed to give information regarding cost of Government building construction based on Standard Drawing. The distribution is limited to Government’s personnel.

All the data regarding the cost in this book is based on As Tendered Detailed Abstract (ATDA) and this information could be used for the preparation in estimating a cost of a project.

To get a copy of this book, kindly contact:

Bahagian Pembangunan dan Khidmat Kos
Cawangan Kontrak dan Ukur Bahan
Ibu Pejabat JKR Malaysia
Tingkat 19, Menara Tun Ismail Mohamad Ali
Jalan Raja Laut
50582 Kuala Lumpur

 

TIMETABLE OF THE PRICE RATE FOR ELECTRICITY REPAIRMENT AND MINOR ELECTRICITY WORKS

Timetable of The Price Rate For Electricity Adjustment and Minor Electricity Works 2016 Edition [JKH(E) 2016] has been updated once in every two years by Department of Electrical Engineering based on the context and settings given by the Ministry of Finance.

The Price Rate Timetable should be used to calculate the cost for ballot works/urgent matter/emergency issue based on the guidelines given by Arahan Penbendaharaan 179 and Pekelilng Perbendaharaan Kaedah Perolehan Kerajaan (PK 2.1) or current market costs. (Refer to Instruction Letter KPKR bil. (26) in JKR/KPKR: 100.010/07 – 5th April 2016.

English
Private document: